Page 18 - HIGHWAY ENGINEERING LABORATORY_FLIP BUILDER
P. 18

REFERENCE
                                      WORK PROCESS
                                                                                     DOCUMENT
             v.  Weight the mass of aggregate in the cylindrical metal
                 container (W2). Determine the mass of the uncrushed sample
                 alone as W3, in which: W3 = W2 – W1.



             vi.  Fix and secure the cylindrical metal container containing the
                 whole of the test sample in it in position on the base of the
                 machine.
             vii.  The test sample is subjected to 15 blows of the hammer
                 dropping 381 mm, each being delivered at an interval not less
                 than one second.

             viii. Unsecure the cylindrical metal container containing the whole
                 of the crushed test sample and weight them. Determine the
                 mass of the crushed sample (M1).

             ix.  Sieve the whole of the sample in the tray on the 2.36 mm BS test
                 sieve until no further significant amount passes in 3 minutes.
                 Weight the fractions passing (M2) and retained (M3) on the
                 sieve to an accuracy of 0.1 g. And if total mass M2 + M3 is less
                 than the initial mass (M1) by more than 1g, discard the result
                 and make a fresh test.














































              Higway Engineering Laboratory                                                                      page     5
   13   14   15   16   17   18   19   20   21   22   23