Page 25 - HIGHWAY ENGINEERING LABORATORY_FLIP BUILDER
P. 25

REFERENCE
                                      WORK PROCESS
                                                                                      DOCUMENT
              • The whole test procedure shall then be examined and modified
                 as necessary to ensure that these requirements for range and
                 mean are satisfied.

              • For satisfactory test runs the PSV of each sample shall be
                 calculated as follows.
              • Calculate the mean value S of the recorded values of the four
                 test specimens (two from each run) and record to the nearest
                 0.1 unit.

              • Calculate the mean value C of the recorded values of the four
                 control specimens (two from each run) and record to the
                 nearest 0.1 unit.

              • Calculate the PSV from the following equation:


                                        PSV = S + 52.5 – C


              • NOTE This equation is valid only for values of C between 49.5

                 and 55.5






             DISCUSSION : * Interpret and comment the results obtained

             a      If the PSV value results with different values, whether the decrease in alumina
             . b.   content will cause PSV weakening. Give a reason?
                    Give two experimentsfor polished stone value.

             CONCLUSION
             a.    Give your conclusion from this experimental and explain the result you get.



             REFERENCES: Give at least 5 references you refer



















              Higway Engineering Laboratory                                                                      page      12
   20   21   22   23   24   25   26   27   28   29   30