Page 77 - HIGHWAY ENGINEERING LABORATORY_FLIP BUILDER
P. 77
DATA
NAME GROUP
CHECKED BY DATE
BULK AND DRY DENSITY
Mass of CBR mould (M1) g
Mass of CBR mould + Mass of g
compacted specimen (M2)
Mass of compacted specimen (M3 = M2 – M1) g
Volume of mould (V) m3
Bulk density, ρb = M3/V g/m 3
Dry density, ρd = 100 ρb / (100 + W) g/m 3
DATA
NAME GROUP
CHECKED BY DATE
WATER CONTENT
Mass of container(M1) g
Massofcontainer+Massofwetsoilsample g
(M2)
Massofcontainer+Massofdrysoilsample(M3) g
Mass of moisture (M4 = M2 – M3) g
Mass of dry soil sample (M5 = M3 – M1) g
Moisture content, W = 100 x (M4 / M5) %
Higway Engineering Laboratory page 64