Page 91 - HIGHWAY ENGINEERING LABORATORY_FLIP BUILDER
P. 91

4.0    DETAILED PROCEDURE : CORING TEST

                                                                                      REFERENCE
                                      WORK PROCESS                                    DOCUMENT
























              1. Select proper location and layout.
              2. Obtain appropriate study length and
                  measure it on site.  Record observations on
                  stopwatch spot speed study data form.

                  Calculate vehiclespeeds.
              3. Generate frequency distribution table and determine speed

                  percentiles.
              4. Dothesefor100vehiclesorONEHOUR.Recordthedatainthe
                  tableasshownbelow.
























                                 Stop watch speed study layout








                                                                                          86
              Higway Engineering Laboratory                                                                      page      86
   86   87   88   89   90   91   92   93   94   95   96