3.0   EQUIPMENTS:



















                         Safety vest                      stop watch             mechanical hand counter.



              4.0   DETAILED PROCEDURE : CORING
              TEST
                                                                                       REFERENCE
                                      WORK PROCESS                                    DOCUMENT

             1. Necessary preparations such as an accurate watch is  performed

                 and the correct time was set, sufficient pens, field  data forms and
                 clipboards, mechanical hand tally counters that  are in good
                 condition, safety vests and others
             2. Enumerators were arrived 30 minutes earlier at the site in order  to

                 familiarize with location, distribute the equipment, fill in the  general
                 information of the tally forms that comprised of sheet  number,
                 station ID, enumerator’s name, date, weather  condition and time
                 to start or finish.

             3. Enumerators have to do field measurements in order to define
                 existing geometric dimension for the intersection under study.
             4. The layout of the intersection was sketched and dimensioned.

             5. The current traffic movements (through, left turn, and right  turn)
                 were identified and begun at the planned time.vi. Proper
                 observer’s position was selected so that they can see clearly,  safely

                 and easily count the traffic.
             6. The counting is done at each lane of each intersection  approach
                 for volume conditions.
             7. The data is checked before leaving the field.