Page 11 - ebook_soil engineering practical workbook_15112021
P. 11

1.3  Apparatus/Equipment


                     Dumpy level/ tilting level/digital level/laser level
                     Tripod
                     Levelling staff with bubble

                     Ranging rod
                     Tape


               1.4  Safety Precautions


                     Before taking out the instrument from the box, mark the positions of (a) the

                     object glass, (b) eye-piece (c) clamp and tangent screws so that while keeping
                     back it can be placed in the box in proper position without any difficulty. Be

                     careful while handling the instrument.




               1.5  Procedures


                      1.5.1 Temporary adjustment


                     Temporary adjustments are to be made at each setup of the instrument. The

                     following are the temporary adjustments to be made.
                     a.       Setting up of the level
                     b.       Levelling up

                     c.       Elimination of parallax.



























                                                                         3 | Soil Engineering Practical Workbook
   6   7   8   9   10   11   12   13   14   15   16