Page 11 - ebook_soil engineering practical workbook_15112021
P. 11
1.3 Apparatus/Equipment
Dumpy level/ tilting level/digital level/laser level
Tripod
Levelling staff with bubble
Ranging rod
Tape
1.4 Safety Precautions
Before taking out the instrument from the box, mark the positions of (a) the
object glass, (b) eye-piece (c) clamp and tangent screws so that while keeping
back it can be placed in the box in proper position without any difficulty. Be
careful while handling the instrument.
1.5 Procedures
1.5.1 Temporary adjustment
Temporary adjustments are to be made at each setup of the instrument. The
following are the temporary adjustments to be made.
a. Setting up of the level
b. Levelling up
c. Elimination of parallax.
3 | Soil Engineering Practical Workbook