Page 41 - HIGHWAY ENGINEERING LABORATORY_FLIP BUILDER
P. 41

REFERENCE
                                      WORK PROCESS
                                                                                      DOCUMENT
              5.  The crushed test sample and weight them. Determine the mass
                  of the crushed sample (M1).
              6.  Sieve the whole of the sample in the tray on the 2.36 mm BS test

                  sieve until no further significant amount passes in 3 minutes.
                  Weight the fractions passing (M2) and retained (M3) on the
                  sieve to an accuracy of 0.1 g. And if total mass M2 + M3 is less
                  than the initial mass (M1) by more than 1g, discard the result
                  and make a fresh test.






                                               Penetration (mm)
             Sample                                                                         Mean
                            1         2        3         4           5        6      7

                  1

                  2

                  3


                * Note : Unit PEN. = 0.1mm (80 PEN.=8 mm)

                The difference of highest and lowest reading of penetration



                                             Highest            Lowest
                     Sample            Penetration (mm) Penetration(mm)            Difference (mm)

                      1

                      2
                      3

























              Higway Engineering Laboratory                                                                      page      28
   36   37   38   39   40   41   42   43   44   45   46