3.0  EQUIPMENT












             Le-Chateliers Apparatus        Water bath                    Vernier Calliper              Balance


            4.0  DETAILED PROCEDURE

                                                                                      REFERENCE
                                      WORK PROCESS
                                                                                      DOCUMENT
             Weights The permissible variations on weights in use in weighing
             the cement shall be as prescribed in Table 1



























             1. Place the lightly oiled mold on a lightly oiled glass sheet and fill it
                with cement paste formed by gauging cement with 0.78 times
                the water required to give a paste of standard consistency.

             2. Cover the mold with another piece of lightly oiled glass sheet,
                place a     small weight on this covering glass sheet and
                immediately submerge the      whole assembly in water at a

                temperature of 27 ± 2°C and keep there for 24 hours.
             3. Measure the distance separating the indicator points to the
                nearest 0.5  mm. Submerge the mold again in water at the
                temperature prescribed above.